Post Energy Project

Post Energy Project

News, Project
Client : Post Energy Date : 19th  September – 10th  October 2015 Shipment : Pertamina Field Tambun – PE Workshop Babelan (Domestic) Detail Shipment : Demobilization 4 x 9 tons cooler, 4 x 43 tons compressor, pipe, 2 x 20’ office containers. Scope of Work : Jacking, Load – Unload , Trucking, Crane. [gallery link="file" size="large" ids="138,139,140,142,143,144,145,146,141,147,148,149,151,152,153,150"]
Read More
GM Project

GM Project

News, Project
Client : General Motor Indonesia Date : 11  September – 8  October 2015 Shipment : Export Jakarta - Nhava Sheva Detail Shipment : GM has  stopped operation and closed their factory in Indonesia  and appointed PJL to do the packing and removed all the equipment to India. Total 1380 cbm, divided in 138 containers mixed 20’ and 40’ DC. Scope of Work : Packing, Load - Unload, Forklift [gallery size="large" link="file" ids="199,193,192,195,196,194,198,197"]  
Read More